Informasi AHSP
Harga Total
Rp 982,917.60
| No | Uraian | Satuan | Koefisien | Harga Satuan | Jumlah Harga |
|---|---|---|---|---|---|
| A. Tenaga Kerja | |||||
| 1 | Pekerja | OH | 0.35 | Rp 135,000.00 | Rp 47,250.00 |
| 2 | Tukang kayu | OH | 0.15 | Rp 218,000.00 | Rp 32,700.00 |
| 3 | Kepala tukang | OH | 0.005 | Rp 245,000.00 | Rp 1,225.00 |
| 4 | Mandor | OH | 0.005 | Rp 222,000.00 | Rp 1,110.00 |
| 5 | Tukang batu | OH | 0.15 | Rp 218,000.00 | Rp 32,700.00 |
| 6 | Tukang besi | OH | 0.1667 | Rp 218,000.00 | Rp 36,340.60 |
| 7 | Tukang Listrik | OH | 0.044 | Rp 218,000.00 | Rp 9,592.00 |
| B. Bahan | |||||
| 1 | Vinyl 30x60 mm | buah | 5.8333333333 | Rp 37,800.00 | Rp 220,500.00 |
| 2 | Lem | kg | 0.35 | Rp 60,000.00 | Rp 21,000.00 |
| 3 | Pintu Panel UPVC | m2 | 1.1 | Rp 325,000.00 | Rp 357,500.00 |
| 4 | Stop Kontak 1p 4 gang | buah | 1.1 | Rp 200,000.00 | Rp 220,000.00 |
| C. Peralatan | |||||
| 1 | Linggis (baja keras) | buah | 0.1 | Rp 30,000.00 | Rp 3,000.00 |
Jumlah Harga (A+B+C)
Rp 982,917.60
Overhead (0.00%)
Rp 0.00
Harga Satuan Pekerjaan
Rp 982,917.60
Informasi Tambahan
- Sumber: Surat Edaran Dirjen Bina Konstruksi No.30 Tahun 2025
- Data terakhir diperbarui: 31 January 2026
- Harga sudah termasuk overhead 0.00%
- Harga belum termasuk pajak