Informasi AHSP
Harga Total
Rp 3,143,872.00
| No | Uraian | Satuan | Koefisien | Harga Satuan | Jumlah Harga |
|---|---|---|---|---|---|
| A. Tenaga Kerja | |||||
| 1 | Pekerja | OH | 2.662 | Rp 135,000.00 | Rp 359,370.00 |
| 2 | Tukang pipa | OH | 0.532 | Rp 218,000.00 | Rp 115,976.00 |
| 3 | Mandor | OH | 0.267 | Rp 222,000.00 | Rp 59,274.00 |
| B. Bahan | |||||
| 1 | Pipa Baja dia. 450 mm | m | 1 | Rp 2,450,000.00 | Rp 2,450,000.00 |
| C. Peralatan | |||||
| 1 | Excavator | Hari | 0.03 | Rp 5,150,000.00 | Rp 154,500.00 |
| 2 | Sewa Tripot | Hari | 0.044 | Rp 108,000.00 | Rp 4,752.00 |
Jumlah Harga (A+B+C)
Rp 3,143,872.00
Overhead (0.00%)
Rp 0.00
Harga Satuan Pekerjaan
Rp 3,143,872.00
Informasi Tambahan
- Sumber: Surat Edaran Dirjen Bina Konstruksi No.30 Tahun 2025
- Data terakhir diperbarui: 24 January 2026
- Harga sudah termasuk overhead 0.00%
- Harga belum termasuk pajak