Informasi AHSP
Harga Total
Rp 78,328.15
| No | Uraian | Satuan | Koefisien | Harga Satuan | Jumlah Harga |
|---|---|---|---|---|---|
| A. Tenaga Kerja | |||||
| 1 | Pekerja | OH | 0.004 | Rp 135,000.00 | Rp 540.00 |
| 2 | Tukang kayu | OH | 0.038 | Rp 218,000.00 | Rp 8,284.00 |
| 3 | Kepala tukang | OH | 0.004 | Rp 245,000.00 | Rp 980.00 |
| 4 | Mandor | OH | 0.001 | Rp 222,000.00 | Rp 222.00 |
| B. Bahan | |||||
| 1 | kaso 5/7 | m3 | 0.005 | Rp 10,214,200.00 | Rp 51,071.00 |
| 2 | Phenol film 12mm | lembar | 0.043 | Rp 230,000.00 | Rp 9,890.00 |
| 3 | Minyak bekisting | liter | 0.2 | Rp 16,800.00 | Rp 3,360.00 |
| 4 | Paku 2 inch | kg | 0.046 | Rp 18,000.00 | Rp 828.00 |
| 5 | Dinabolt dia. 12mm (10-15 cm) | buah | 0.693 | Rp 4,550.00 | Rp 3,153.15 |
| C. Peralatan | |||||
| Tidak ada data peralatan. | |||||
Jumlah Harga (A+B+C)
Rp 78,328.15
Overhead (0.00%)
Rp 0.00
Harga Satuan Pekerjaan
Rp 78,328.15