Informasi AHSP
Harga Total
Rp 2,558,700.00
| No | Uraian | Satuan | Koefisien | Harga Satuan | Jumlah Harga |
|---|---|---|---|---|---|
| A. Tenaga Kerja | |||||
| 1 | Pekerja | OH | 1 | Rp 135,000.00 | Rp 135,000.00 |
| 2 | Tukang besi | OH | 1 | Rp 218,000.00 | Rp 218,000.00 |
| 3 | Tukang kaca | OH | 1 | Rp 218,000.00 | Rp 218,000.00 |
| 4 | Kepala tukang | OH | 0.25 | Rp 245,000.00 | Rp 61,250.00 |
| 5 | Mandor | OH | 0.5 | Rp 222,000.00 | Rp 111,000.00 |
| B. Bahan | |||||
| 1 | Stainless Steel Plate / Huruf Timbul | m2 | 1.05 | Rp 350,000.00 | Rp 367,500.00 |
| 2 | Akrilik 4 mm | m2 | 1.05 | Rp 179,000.00 | Rp 187,950.00 |
| 3 | Led Backlit 4 watt | m2 | 1.05 | Rp 1,200,000.00 | Rp 1,260,000.00 |
| C. Peralatan | |||||
| Tidak ada data peralatan. | |||||
Jumlah Harga (A+B+C)
Rp 2,558,700.00
Overhead (0.00%)
Rp 0.00
Harga Satuan Pekerjaan
Rp 2,558,700.00
Informasi Tambahan
- Sumber: Surat Edaran Dirjen Bina Konstruksi No.30 Tahun 2025
- Data terakhir diperbarui: 19 January 2026
- Harga sudah termasuk overhead 0.00%
- Harga belum termasuk pajak