Informasi AHSP
Harga Total
Rp 1,962,232.00
| No | Uraian | Satuan | Koefisien | Harga Satuan | Jumlah Harga |
|---|---|---|---|---|---|
| A. Tenaga Kerja | |||||
| 1 | Pekerja | OH | 1 | Rp 135,000.00 | Rp 135,000.00 |
| 2 | Tukang kayu | OH | 1 | Rp 218,000.00 | Rp 218,000.00 |
| 3 | Kepala tukang | OH | 0.1 | Rp 245,000.00 | Rp 24,500.00 |
| 4 | Tukang pelitur | OH | 1.5 | Rp 218,000.00 | Rp 327,000.00 |
| 5 | Mandor | OH | 0.1 | Rp 222,000.00 | Rp 22,200.00 |
| B. Bahan | |||||
| 1 | Multiplek tebal 18 mm | lembar | 0.35 | Rp 226,600.00 | Rp 79,310.00 |
| 2 | Tiang kayu 8/12 kelas II tinggi 4m | m3 | 0.077 | Rp 11,950,000.00 | Rp 920,150.00 |
| 3 | Frame besi L.30.30.3 | kg | 5.8 | Rp 14,840.00 | Rp 86,072.00 |
| 4 | Paku campuran 5 cm + 7 cm | kg | 1.25 | Rp 20,000.00 | Rp 25,000.00 |
| 5 | Cat kayu | kg | 2.5 | Rp 50,000.00 | Rp 125,000.00 |
| C. Peralatan | |||||
| Tidak ada data peralatan. | |||||
Jumlah Harga (A+B+C)
Rp 1,962,232.00
Overhead (0.00%)
Rp 0.00
Harga Satuan Pekerjaan
Rp 1,962,232.00
Informasi Tambahan
- Sumber: Surat Edaran Dirjen Bina Konstruksi No.30 Tahun 2025
- Data terakhir diperbarui: 18 January 2026
- Harga sudah termasuk overhead 0.00%
- Harga belum termasuk pajak