Informasi AHSP
Harga Total
Rp 12,869,034.00
| No | Uraian | Satuan | Koefisien | Harga Satuan | Jumlah Harga |
|---|---|---|---|---|---|
| A. Tenaga Kerja | |||||
| 1 | Pekerja | OH | 4 | Rp 135,000.00 | Rp 540,000.00 |
| 2 | Tukang Listrik | OH | 2 | Rp 218,000.00 | Rp 436,000.00 |
| 3 | Kepala tukang | OH | 0.2 | Rp 245,000.00 | Rp 49,000.00 |
| 4 | Mandor | OH | 0.067 | Rp 222,000.00 | Rp 14,874.00 |
| B. Bahan | |||||
| 1 | Batang Tembaga Pembumian Dia.5/8” (kedalaman min. 12 m) | batang | 6 | Rp 1,135,000.00 | Rp 6,810,000.00 |
| 2 | Pantek (kedalaman min. 12 m) | lot | 1 | Rp 245,000.00 | Rp 245,000.00 |
| 3 | Kabel BC 95 mm2 | m | 26.4 | Rp 145,000.00 | Rp 3,828,000.00 |
| 4 | Kabel Skun 95 mm2 | m | 4.4 | Rp 26,400.00 | Rp 116,160.00 |
| 5 | Rod Coupling | buah | 6 | Rp 130,000.00 | Rp 780,000.00 |
| 6 | Material Bantu | loat | 1 | Rp 50,000.00 | Rp 50,000.00 |
| C. Peralatan | |||||
| Tidak ada data peralatan. | |||||
Jumlah Harga (A+B+C)
Rp 12,869,034.00
Overhead (0.00%)
Rp 0.00
Harga Satuan Pekerjaan
Rp 12,869,034.00
Informasi Tambahan
- Sumber: Surat Edaran Dirjen Bina Konstruksi No.30 Tahun 2025
- Data terakhir diperbarui: 21 January 2026
- Harga sudah termasuk overhead 0.00%
- Harga belum termasuk pajak